Skip ke Konten
EVM GeForce GT610 Graphics Card GPU 124; 2GB DDR3 124; PCIe 2.0 14; HDMI DVI VGI 14; 1080p Full HD 124; Sink Fan Cooling 124; Profil Rendah 124; Desktop Compatible 124; Performansi Stable 124; 3 TAHUN Warty (EVMGUS610)

Price:

$ 45,80


EVM GeForce GT610 Graphics Card GPU 124; 2GB DDR3 124; PCIe 2.0 14; HDMI DVI VGI 14; 1080p Full HD 124; Sink Fan Cooling 124; Profil Rendah 124; Desktop Compatible 124; Performansi Stable 124; 3 TAHUN Warty (EVMGUS610)

https://gofinchkart.id/web/image/product.template/146070/image_1920?unique=2b123d6
9 sold in last 24 hours
  • NVIDIA GT610 GPU, 2GB DDR3 - Smooth Full HD Visuals: buffer frame DDR3 2GB memberikan handal 1920 × 1080 Penampilan penuh HD untuk pemutaran video, aplikasi kantor, peramban web, dan penggunaan multimedia sehari-hari.
  • VGA + HDMI + DVI Triple Keluaran - Maksimum Tampilan Fleksibilitas: Tiga port keluaran simultan terhubung ke monitor HDMI modern, menampilkan DVI, dan projectors VGA - meliputi hampir semua konfigurasi tampilan.
  • Panas Sink + Fan - Manajemen Thermal Efektif: Solusi pendinginan terintegrasi memastikan suhu GPU konsisten di bawah tampilan kerja berkelanjutan untuk kinerja keluaran grafis jangka panjang yang dapat diandalkan.
  • PCIe 2.0 Interface - Wide System Compatibility: Dukungan PCIe 2.0 x16 menjamin kompatibilitas seamless dengan baik motherboard desktop warisan dan modern tanpa membutuhkan PCIe 3.0 atau slot baru.
  • Konsumsi Daya Rendah, Premium Build - 3 Tahun Peringatan: Energi - efisien desain pakaian sistem dengan pasokan daya sederhana. Komponen kualitas tertinggi untuk daya tahan jangka panjang. Dibajak oleh garansi 3 tahun EVM.

$ 45,80 45.8 USD $ 45,80

Not Available For Sale

($ 45,80 / Units)
4 people are viewing this right now

  • Manufaktur
  • Cacah Unit
  • Brand
  • UPC
  • Jumlah Objek
  • Kecepatan Jam Memori
  • Nama Model
  • Perangkat Kompatibel
  • Koprosor Grafis
  • Jumlah Paket
  • Nomor Bagian Manufaktur
  • Negara Asal
  • Nomor Model
  • Nama Tipe Butir
  • Tipe Produk
  • Isi Kotak
  • Informasi Kontak Packer
  • Informasi Kontak Pengimpor
  • Unit Berat Butir Measure
  • Informasi Kontak Manufaktur
  • Lokasi Antena
  • Dimensi Butir L x W
  • Resolusi Tampilan Maksimum
  • Kecepatan Jam GPU
  • Antarmuka Keluaran Video
  • Kartu Grafis Ram
  • Jenis Grafik Ram
  • Antarmuka Kartu Grafik
  • Tampilkan Resolusi Maksimum
  • Jumlah Fans
  • Prosesor Video
  • Keterangan Grafik

Kombinasi ini tidak tersedia.

Kartu Grafik Kartu Grafik

Syarat dan Ketentuan
Jaminan 30-hari uang-kembali
Pengiriman: 2-3 Hari Kerja

Estimated shipping
Select a product to estimate shipping.

EVM GeForce GT610 adalah kartu grafis compact dan terjangkau yang dirancang untuk meningkatkan kinerja visual desktop PC Anda yang lebih tua. Ini adalah pilihan yang dapat diandalkan untuk tugas komputasi sehari-hari dan game ringan, menawarkan upgrade yang terlihat atas grafis terpadu.

Highlight Kunci

  • Full HD Display Support: Enjoy smooth 1920x1080 resolution visuals for video playback, web browsing, and general use.
  • Multiple Display Outputs: Connect to a variety of monitors with HDMI, DVI, and VGA ports.
  • Effective Cooling: The integrated heat sink and fan keep temperatures stable during extended use.
  • Broad Compatibility: Designed to work with PCIe 2.0 slots on most desktop motherboards.
  • Peace of Mind: Backed by a 3-year warranty for reliable performance.

Fakta Berguna

  • Graphics Processor: NVIDIA GeForce GT 730 4GB
  • Memory: 2GB DDR3 SDRAM
  • Clock Speed: 993 MHz (GPU) / 901 MHz (Memory)
  • Display Resolution: Up to 1920x1080 pixels
  • Interface: PCIe 2.0 x16

Good Fit For

  • Gaming (judul cahaya dan permainan yang lebih tua)
  • Produktivitas Kantor
  • Foto dan Penyuntingan Video (tugas dasar)
  • Penggunaan Umum Multimedia
  • Meningkatkan sistem desktop yang lebih tua

Rincian produk

EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)
EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)
EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)
EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)
EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)
EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)
EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)
Main Specification
Manufaktur EVM, Toll Free No: 180 010 20432 atau Email kami pada dukungan @ evmzone.com
Cacah Unit Cacah 1.0
Brand EVM
UPC 726684515264
Jumlah Objek 1
Kecepatan Jam Memori 901 MHz
Nama Model GEFORCE NVIDIA GT610 2GB GRAPHIC CARD
Perangkat Kompatibel Desktop
Koprosor Grafis GT 730 4GB GVIDIA
Product information
Jumlah Paket 1
Technical Details
Nomor Bagian Manufaktur EVM- GT610
Negara Asal Cina
Item details
Nomor Model 2GB GT-610
Nama Tipe Butir Kartu Grafis
Others
Informasi Kontak Packer Lantai 1 or 391 or DIAMOND PLAZA BUILDING or Dr. D. B. MARG or LAMINGTON ROAD or MUMBAI- 400004 INDIA or Infolasi Hundia PVT LTD or 102
Lokasi Antena Permainan or Kantor or Profesional or Foto & Editing Video
Antarmuka Keluaran Video HDMI or VGA or DVI
Tipe Produk Kartu Grafis
Isi Kotak 1 Kartu Grafik
Informasi Kontak Pengimpor Toll Free No: 180 010 20432 atau Email kami pada dukungan @ evmzone.com
Unit Berat Butir Measure 500 Grams
Informasi Kontak Manufaktur Toll Free No: 180 010 20432 atau Email kami pada dukungan @ evmzone.com
Dimensi Butir L x W 20L x 15W Centimeters
Resolusi Tampilan Maksimum Pixel 1920x1080
Kecepatan Jam GPU 993 MHz
Kartu Grafis Ram 4 GB
Jenis Grafik Ram DDR3 SDRAM
Antarmuka Kartu Grafik PCI- Express x16
Tampilkan Resolusi Maksimum 1920x1080 piksel
Jumlah Fans 1
Prosesor Video NVIDIA
Keterangan Grafik Nvidia GeForce GT610 2GB DDR3